---
title: "Construction Scheduling Engineer… – Fountain Valley, CA"
canonical: "https://www.metaintro.com/job/construction-scheduling-engineer-at-rba-builders-6a176701-2db7-5d8d-b76c-6c6873a02820"
language: "en"
author: "Metaintro"
---

[/company/rba-builders](/company/rba-builders)[RBA Builders](/company/rba-builders)
# Construction Scheduling Engineer at RBA Builders

Department: Field OperationsSeniority in posting: Entry-level

Compensation · Listed in posting

$50,000 – $60,000/yr

**Setup**
: On-site

**Location**
: Fountain Valley, California

**Type**
: Full-time

**Level**
: entry

**Posted**
: Jan 22, 2026

## Description

RBA Builders is hiring an entry-level Construction Scheduler to support construction scheduling and project planning across the company’s commercial, industrial, entertainment, educational, aerospace, and medical projects. The role assists with developing and maintaining schedules, tracking progress, identifying schedule impacts, supporting preconstruction and estimating, preparing reports, and integrating safety and risk planning. The position is based in Fountain Valley, California, offers $50,000-$60,000 annually, and includes health, dental, vision, retirement matching, paid time off, and training.

## Trending job searches

Every query opens live roles, salary samples, and market demand — tap a search to run it instantly.

- [Find Construction Scheduling Engineer jobs in Fountain Valley, California, United States](/jobs/search?q=Find+Construction+Scheduling+Engineer+jobs+in+Fountain+Valley%2C+California%2C+United+States)
- [Find roles similar to Construction Scheduling Engineer in Fountain Valley, California, United States](/jobs/search?q=Find+roles+similar+to+Construction+Scheduling+Engineer+in+Fountain+Valley%2C+California%2C+United+States)
- [Find Construction Scheduling Engineer jobs with Primavera P6 and MS Project](/jobs/search?q=Find+Construction+Scheduling+Engineer+jobs+with+Primavera+P6+and+MS+Project)
- [Find jobs similar to Construction Scheduling Engineer](/jobs/search?q=Find+jobs+similar+to+Construction+Scheduling+Engineer)
- [Find Construction Scheduling Engineer jobs posted this week](/jobs/search?q=Find+Construction+Scheduling+Engineer+jobs+posted+this+week)
- [Find Construction Scheduling Engineer jobs paying $50,000 or more per year](/jobs/search?q=Find+Construction+Scheduling+Engineer+jobs+paying+%2450%2C000+or+more+per+year)
- [Find Architecture and Construction jobs in Fountain Valley, California, United States](/jobs/search?q=Find+Architecture+and+Construction+jobs+in+Fountain+Valley%2C+California%2C+United+States)
- [Find Architecture and Construction jobs with Primavera P6 and MS Project](/jobs/search?q=Find+Architecture+and+Construction+jobs+with+Primavera+P6+and+MS+Project)

## Get More from Metaintro

Unlock powerful job search, personalized recommendations, and deep career insights from comprehensive, market-leading data and live market signals.

- [Browse all jobs](/jobs/search)
- [Access help center](/help)
- [Explore our content](/blog)

![](https://cdn.metaintro.com/rs:fill:1200:800/q:30/plain/images/bridges/bridge-expand.1df895c6bd76d96f.png)

For job seekers

## Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

[Get Started Free](/signup)[Search matching jobs](/jobs/search)

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

[Return to navigation](#main-navigation)