---
title: "Data Center Construction Manager at AECOM – Las Vegas, NV"
canonical: "https://www.metaintro.com/job/data-center-construction-manager-at-aecom-2a260210-2dbb-5e41-8d8b-64d47c2a7b83"
language: "en"
author: "Metaintro"
---

[![AECOM logo](/api/company-logo?url=https%3A%2F%2Faecom.com%2Fwp-content%2Fuploads%2F2024%2F10%2Fcropped-favicon-32x32-1-300x300.png&sig=1AZ537szgO8GVYS8zQt3-vDweBx4wwjDHFZ3jbOsyrA)](/company/aecom)[AECOM](/company/aecom)
# Data Center Construction Manager at AECOM

Seniority in posting: senior

Compensation

$95,000 – $130,000/yr

**Setup**
: On-site

**Location**
: Las Vegas, Nevada

**Type**
: Full-time

**Level**
: lead/mgmt

**Posted**
: Jul 16, 2026

## Description

AECOM is hiring a Data Center Construction Manager to work on-site in Las Vegas, Nevada. The role manages pre-construction, design, construction phasing, closeout, occupancy, warranty enforcement, scheduling, testing, inspections, documentation, budget tracking, and coordination with clients, vendors, general contractors, project controls, and project teams. The position requires a bachelor's degree plus four years of experience or equivalent education and experience; a bachelor's degree in architecture, engineering, urban planning, construction management, or a related field and ten years of construction experience are preferred. US employment authorization sponsorship and relocation are not available.

## Trending job searches

Every query opens live roles, salary samples, and market demand — tap a search to run it instantly.

- [Find Data Center Construction Manager jobs in Las Vegas, Nevada, United States](/jobs/search?q=Find+Data+Center+Construction+Manager+jobs+in+Las+Vegas%2C+Nevada%2C+United+States)
- [Find roles similar to Data Center Construction Manager in Las Vegas, Nevada, United States](/jobs/search?q=Find+roles+similar+to+Data+Center+Construction+Manager+in+Las+Vegas%2C+Nevada%2C+United+States)
- [Find Data Center Construction Manager jobs with Project management and Scheduling](/jobs/search?q=Find+Data+Center+Construction+Manager+jobs+with+Project+management+and+Scheduling)
- [Find jobs similar to Data Center Construction Manager](/jobs/search?q=Find+jobs+similar+to+Data+Center+Construction+Manager)
- [Find Data Center Construction Manager jobs posted this week](/jobs/search?q=Find+Data+Center+Construction+Manager+jobs+posted+this+week)
- [Find Data Center Construction Manager jobs paying $90,000 or more per year](/jobs/search?q=Find+Data+Center+Construction+Manager+jobs+paying+%2490%2C000+or+more+per+year)
- [Find Architecture and Construction jobs in Las Vegas, Nevada, United States](/jobs/search?q=Find+Architecture+and+Construction+jobs+in+Las+Vegas%2C+Nevada%2C+United+States)
- [Find Architecture and Construction jobs with Project management and Scheduling](/jobs/search?q=Find+Architecture+and+Construction+jobs+with+Project+management+and+Scheduling)

## Get More from Metaintro

Unlock powerful job search, personalized recommendations, and deep career insights from comprehensive, market-leading data and live market signals.

- [Browse all jobs](/jobs/search)
- [Access help center](/help)
- [Explore our content](/blog)

![](https://cdn.metaintro.com/rs:fill:1200:800/q:30/plain/images/bridges/bridge-expand.1df895c6bd76d96f.png)

For job seekers

## Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

[Get Started Free](/signup)[Search matching jobs](/jobs/search)

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

[Return to navigation](#main-navigation)