Description
The Floor Layer installs and finishes floor and wall coverings, including preparing and leveling surfaces, installing ceramic tiles, cutting and aligning tiles, applying adhesive or mortar, grouting, and performing minor repairs. The role requires construction or floor-layer experience, accuracy, teamwork, flexibility, reliability, and availability for 2 to 3 days per week, with a quick start and potential for long-term collaboration.
