Skip to main content

Methods Engineer – Boiler Making F/M at ADSN Career

Language

Compensation

€30,000 – €40,000/yr

Location
Saint-Pair-sur-Mer, Normandy
Type
Full-time
Level
mid
Posted

Description

EDF is hiring a Methods Engineer – Boiler Making F/M for its Flamanville nuclear power plant in Normandy, France. The role schedules and monitors equipment, translates maintenance programs into operational actions, analyzes deviations and high-stakes phases, supports reliability improvements, updates component and system information systems, and defines spare-parts stock levels. It requires a two- or three-year post-secondary qualification in industrial, mechanical, or production engineering, initial experience is an asset, and the position is on a permanent contract with an on-call rotation. The stated gross annual salary is €30,000 to €40,000, with a minimum gross salary of €25,000 listed in the candidate criteria.

For job seekers

Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

Return to navigation