Skip to main content

Pipelayer – Underground Utilities Construction at Ella SA Contracting

Location
San Antonio, Texas
Level
mid
Posted

Description

The Pipelayer will install and align water, sewer, storm drainage, and other underground utility pipes; prepare and backfill trenches; operate or assist with heavy equipment; inspect and test installations; and follow OSHA and trench-safety procedures. The role requires at least two years of Pipelayer or underground utility construction experience, knowledge of pipe materials and installation techniques, blueprint-reading ability, and the physical stamina to work outdoors in varying conditions.

For job seekers

Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

Return to navigation