Skip to main content

Production Planner/Master Scheduler 3 at lamresearch

Department: Manufacturing

Language
Setup
On-site
Location
Taoyuan
Level
senior
Posted

Description

The Master Scheduler plans, schedules, coordinates, and monitors products through the complete production cycle. The role uses engineering plans and production specifications to establish production schedules, labor loading, and capacity requirements; coordinates materials and production plans; interfaces with marketing, sales, production, and engineering managers; and resolves labor and material shortages, backlogs, design changes, and other schedule interruptions. The position requires at least five years of related experience with a bachelor’s degree, or three years with a master’s degree, or a PhD without experience, or equivalent work experience. Work arrangements may be on-site flex or virtual flex.

For job seekers

Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

Return to navigation