Summary from listing
The Principal Project Controls Specialist is a critical lead position responsible for cost management. The role starts in Charlotte and targets mobilization to a site in Spring 2028, with the site location to be determined but within a one-hour drive of Charlotte. A per diem will be offered at the time of mobilization if eligible, and the posting does not state whether it is before or after mobilization.
