Skip to main content

Thesis Project – How Is the Power Grid Doing? at Vattenfall

Department: DistributionSeniority in posting: entry

Language
Setup
On-site
Location
Trollhättan
Type
Internship, Contract
Level
intern
Posted

Description

Vattenfall is recruiting one or two master’s thesis students for a 30-ECTS project in the Power Systems & Operational Optimization department. The thesis will analyse grid outages, faults, KPIs, load situations, and operational deviations; define overload and complex operating situations; and develop grid-status visualisation concepts such as maps, dashboards, trend charts, and colour-coded risk levels. The assignment starts at the start of the spring 2027 term, with work opportunities in Solna, Västerås, and Trollhättan, and a final application date of 2026-10-18.

For job seekers

Ready to find a role that actually fits?

Upload your résumé, start a Job Search Thread, and let Metaintro rank real openings against your experience — then guide you from search to offer.

Match

Compare live roles against your current evidence.

Position

Turn proof projects into role-specific applications.

Improve

Use market feedback to keep the skill plan current.

Return to navigation